top of page

Office Expansion | High-Spec Corporate Fit-Out

A seamless floor-space expansion into a vacant office suite, designed to increase capacity and functionality while maintaining a "business as usual" environment for the client

Construction Site and Clouds

Project details

Project Overview


This project involved the expansion of an existing corporate office into adjacent unoccupied space. The primary goal was to create a bright, modern environment featuring new boardroom and meeting facilities, a dedicated lounge area, and specialized IT testing zones.


Scope of Works


  • Space Reconfiguration: Installation of plasterboard partitions and acoustic glazed screens to create private meeting areas.

  • Acoustic Solutions: Integration of a Becker sliding/stacking door system to provide flexible, sound-proofed boardroom spaces.

  • Mechanical & Electrical: Full alteration of power and data layouts, alongside the installation of a new high-efficiency A/C system.

  • Interior Finishes: Installation of Milliken carpets, vinyl flooring, and updated wall finishes throughout the expansion.

  • Specialist Zones: Creation of a new glazed lounge area and dedicated IT testing environments.


Materials Used


  • Acoustics: Becker sliding stacking door system and acoustic-rated glazing.

  • Flooring: Milliken premium carpet tiles and durable vinyl.

  • Partitioning: High-performance plasterboard and glazed screen systems.


Project Timeline


  • Total Duration: 12 Weeks (from site mobilization to handover).


Challenges & Solutions


  • Live Environment Logistics: Operating within a "business as usual" setting required strict noise control and scheduled works to avoid disrupting the client’s daily operations.

  • Second-Floor Access: Navigating material deliveries and waste removal from the second floor was managed via a "load and wait" principle to maintain site efficiency and safety.

  • Sustainability: To maximize the budget and reduce environmental impact, we focused on remodeling and recycling existing acoustic elements and furniture where possible.

Outcome


The project delivered a seamless transition between the original office and the new expansion. By matching finishes perfectly and managing the build within a live environment, we provided the client with a high-functioning, light-filled workspace—delivered on time and strictly to budget.

bottom of page